The retaining wall in nearing completion, the darker blocks were fresh from Vancouver and the lighter blocks wintered here in Kelowna. The manufacturer and the distributor both noted this is common and they will be the same colour in 2-5 months as the concrete cures.
All of the ceiling drops are complete, rough-in is completed for plumbing, heating and electrical, siding will be completed Friday ready for inspections on Monday.
Building Progress
Thursday, February 19, 2015
Tuesday, February 17, 2015
Exterior and Sub-trades
The slippery slope on the south side of the house is now fully stabilized allowing the crews to complete the siding on the south wall of the home. Plumbing is roughed-in, heating is roughed-in, electrical will be roughed-in by Monday Feb 23 ceiling drops are 80% complete. Insulation is expected to be complete by March 2 ready for drywall. The fireplace is on site and will be installed this week.
Saturday, February 7, 2015
Exterior and Sub-trades
Although it's been some time since our last post the crews have been busy. Windows were installed in the second week of January, the Hardie siding is nearing completion, electrical, plumbing and heating will be completed on or about the 17 of February.