The slippery slope on the south side of the house is now fully stabilized allowing the crews to complete the siding on the south wall of the home.  Plumbing is roughed-in, heating is roughed-in, electrical will be roughed-in by Monday Feb 23 ceiling drops are 80% complete.  Insulation is expected to be complete by March 2 ready for drywall.  The fireplace is on site and will be installed this week.