Lots accomplished this week despite the cold weather and snow. All foundation walls are now fully protected from the frost with back fill so we are finished with the last of the tarps. The floor joist package and steel beam arrived on schedule. The basement walls are framed and the steel beam for the main floor joists is also in place.