Building Progress

Tuesday, November 18, 2014

Footings

We have maintained the tarps over the entire floor area of the home since we started the excavation on the 11th.  On Friday the 14th all perimeter footings, strip footings, and pads were formed and ready to pour however it was just too late in the day to attempt the pour.  On Monday 8:00 AM the equipment started to arrive and the pour was completed by 10:00 AM.  All insulated tarps were replaced over the footings and entire floor area.